top of page

Prime Contract & Task Orders

Prime Contract:     N00178-14-D-7978

Seed Task Order:  N00178-14-D-7978-001

 

​
Geographical Zones

 

Truston is a SeaPort-e prime contract holder in six of the seven geographic regions:  Northeast, National Capital, Mid-Atlantic, Gulf Coast, Midwest, and Southwest.  We have also performed work OCONUS under SeaPort-e.

 


Point of Contact

​
Truston's main point of contact for the SeaPort-e program is

Christopher Pfaff, 410-571-5186, cpfaff@truston.us

​

SEAPORT

 

Functional Areas & Experience

​

Truston and our partners provide support for the following functional areas:

 

  1. Research and Development Support

  2. Engineering System Engineering and Process Engineering Support

  3. Modeling, Simulation, Stimulation, and Analysis Support

  4. Prototyping, Pre-Production, Model-Making, and Fabrication Support

  5. System Design Documentation and Technical Data Support

  6. Software Engineering, Development, Programming, and Network Support

  7. Reliability, Maintainability, and Availability (RM&A) Support

  8. Human Factors, Performance, and Usability Engineering Support

  9. System Safety Engineering Support

  10. Configuration Management (CM) Support

  11. Quality Assurance (QA) Support

  12. Information System (IS) Development, Information Assurance (IA), and Information Technology (IT) Support

  13. Ship Inactivation and Disposal Support

  14. Interoperability, Test and Evaluation, Trials Support

  15. Measurement Facilities, Range, and Instrumentation Support

  16. Acquisition Logistics Support

  17. Supply and Provisioning Support

  18. Training Support

  19. In-Service Engineering, Fleet Introduction, Installation and Checkout Support

  20. Program Support

  21. Functional and Administrative Support

  22. Public Affairs and Multimedia Support

​

 

Quality Assurance

Truston’s Quality Management System (QMS) is certified to ISO 9001:2015 with design standard.  Our teams are selected specifically to achieve the goals of each project; we determine the optimal combination of personnel, equipment, and material suppliers. All projects are executed in compliance with EM-385-1-1, P-307, OSHA, and contract specific Quality, Health, Safety, and Environment requirements.

​

Team Members

Smith LaSalle Engineering

Stewart Technology & Associates (STA)

​

bottom of page